Skip to content

Ouaga Info

Your go-to English source for news from Ouagadougou and Burkina Faso, updated daily.

Menu
  • Home
  • Guides
  • Case Studies
  • Tutorials
  • Analysis
  • Resources
  • Opinions
  • Chronicle
Menu

New eight-lane road in Kinshasa to ease traffic congestion

Posted on August 12, 2026September 25, 2026 by Cécile Mboua
Listen to the article≈ 3 min
major infrastructure

Kinshasa unveils Étienne Tshisekedi boulevard: a new eight-lane artery for the capital

Kinshasa is set to gain a vital new roadway designed to significantly ease traffic flow in one of the city’s most congested zones. President Félix Tshisekedi inaugurated work on the Étienne Tshisekedi boulevard, a 2.02-kilometre, eight-lane thoroughfare awarded to China Railway 20th Bureau Group. The 12-month project includes a 750-metre ramp, drainage networks, bridges, culverts, and a full lighting system.

  • infrastructure
  • Wednesday, August 12, 2026
Aerial rendering of the future boulevard Étienne Tshisekedi in Kinshasa, DRC

During Tuesday’s groundbreaking in Kinshasa, President Félix Tshisekedi laid the foundation stone for the Étienne Tshisekedi boulevard, marking the official start of construction. Prime Minister Judith Suminwa Tuluka and Kinshasa Governor Daniel Bumba attended the ceremony alongside local officials and community leaders. The infrastructure will feature a 2,020-metre main carriageway split into eight lanes—four in each direction—plus a 750-metre two-lane ramp. Additional elements include modern drainage channels, elevated bridges, culverts, and energy-efficient street lighting. The contract stipulates completion within twelve months.

China Railway 20th Bureau Group embarks on first public contract in DRC

The project has been entrusted to China Railway 20th Bureau Group (CR20), a Chinese firm with extensive experience in large-scale infrastructure. Zhang Guoxu, General Manager of CR20 Angola International Company, confirmed that this marks the company’s inaugural public-sector contract in the Democratic Republic of the Congo. He emphasised the group’s commitment to meeting strict technical standards, delivering high-quality construction, and minimising environmental impact throughout the 12-month build. Governor Daniel Bumba reiterated the need to adhere to technical specifications and contractual timelines, stressing that the new roadway should swiftly ease chronic traffic bottlenecks in the targeted district.

Before the ceremony, President Tshisekedi reviewed detailed plans, including the boulevard’s proposed layout, cross-sections, and key structures. 3D renderings and scale models gave a clear picture of the finished artery, which is intended to expand road capacity and streamline movement across a capital city plagued by persistent gridlock. Once operational, the Étienne Tshisekedi boulevard will integrate with Kinshasa’s existing network, offering wider lanes, improved safety features, and better connectivity. Success hinges on rigorous project execution, strict adherence to the 12-month schedule, and seamless integration with surrounding traffic flows. Upon completion, the new route aims to relieve pressure on several overburdened corridors and contribute to more fluid urban mobility.

By Cécile Mboua — Political News Writer

News feeds (RSS)Get new articles in your favourite feed reader
Le Monde AfriqueAll stories

Recent Posts

  • Burkina Faso and Japan: public debate intensifies over JICA’s long-term impact
  • Kemi Seba’s prolonged detention: South African court postpones Benin extradition to 2027
  • Gold mining crackdown: Burkina Faso’s harsh tactics spark backlash over double standards
  • Guinea’s media regulator bans Burkina Faso’s state broadcaster amid political concerns
  • West Africa’s contrasting paths: digital talent versus urgent social crises

Recent Comments

No comments to show.

Archives

  • November 2026
  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • November 2024
  • October 2024
  • September 2024
  • July 2024
  • June 2024
  • May 2024
  • March 2024
  • February 2024
  • October 2023
  • August 2023
  • May 2023
  • April 2023
  • October 2022
  • September 2022
  • May 2022
  • March 2022
  • August 2021
  • June 2021
  • May 2021
  • October 2020
  • September 2020
  • June 2020
  • November 2019
  • July 2018
  • December 2014

Categories

  • A la Une
  • Actualités
  • AES
  • Analyses
  • Analysis
  • Authoritarian Regimes & Africa
  • Chronicle
  • Culture
  • Economy
  • Entertainment
  • Guides
  • International
  • Le Monde Afrique
  • Lifestyle
  • News
  • Opinions
  • Politics
  • Security & Defence
  • Société
  • Society
  • Sports
  • Tech
  • Top Stories
©2026 Ouaga Info | Design: Newspaperly WordPress Theme
Ouaga Info

Your go-to English source for news from Ouagadougou and Burkina Faso, updated daily.

About Us Contact Privacy Policy Legal Notice

© 2026 Ouaga Info — All rights reserved.

https://ouagainfo.com